Site Walk
August 16, 2005
Craig Higgins (14 lot subdivision) – R9, Lot 38
1. Call to order: The Site Walk was called to order at 5:30 PM.
2. Attendance:
PB Members present were Chairman Rick Micklon, Vice Chair Stan Brett, Dan Peaco, Win Webster, Maureen Howard, Alternate Mike McAllister, Recording Secretary – Alternate Shirley Hamilton and PB Secretary Tanya Taft.
Public Attendance:
1. Bob & Pat Blake 252 Bean Road, Otisfield, ME Abutters
2. Rick & Laurie Redfield P.O. Box 1080, Naples, ME Abutters
3. Gary Tougas 23 Rocky Road, Otisfield, ME resident
4. Garry Dyer 629 State Route 121 Fire Chief
5. Herb & Diana Olsen 141 Coon Road Abutters
6. Jen Otterson Press - Sun Journal
Professionals:
1. Craig Higgins Design Engineer - Applicant
2. Mike Haskell Project Engineer - Applicant
3. Scott Williams Aquatic Biologist – Consultant for Town of Otisfield
3. Discussion & Comments:
Site Walk was opened by RM and turned over to Craig Higgins for the guided walk
Markers:
Pink strand = test pit
Blue only = wetland
Red & white = center of road
The road will be 20’ paved with 3’ shoulders on each side.
DEP will be checking this project. On lot 12 buildings need to be 75’ from channel of street. Concrete footings may need to be put in where culvert is expected to be. This is a permit by rule operation. Test pit 5 did not pass. (Ledge).
Existing snowmobile trail – relocated for future use. Work in progress, but hoping to get a deeded right granted for snowmobile club.
Fire Protection – lack of water, looking into a fire pond or an underground water tank.
4. Adjournment: 6:40 PM
Respectfully submitted,
Tanya Taft, Recording Secretary
Approved By: ____________________ Approved on: _________
Rick Micklon, Chair
Otisfield Planning Board
|